 "name": "What the law makes a plant record about its equipment",
 "title": "What the law makes a plant record about its equipment",
 "kind": "terms-board",
 "url": "https://sellmaintenancedatatoai.com/datasets/maintenance-records-law/",
 "csv": "https://sellmaintenancedatatoai.com/datasets/maintenance-records-law.csv",
 "markdown": "https://sellmaintenancedatatoai.com/datasets/maintenance-records-law/index.md",
 "computed_at": "2026-11-08",
 "license": "https://sellmaintenancedatatoai.com/terms",
 "headline": "2 of 13 equipment record rules read fix a period for keeping the record, newest read 8 November 2026.",
 "quotes": [
  "2 of 13 equipment record rules read fix a period for keeping the record, newest read 8 November 2026.",
  "What must be recorded, by rule: the result of an inspection, examination or test 9 of 13, refrigerant or gas leak checks and repairs 2 of 13, a maintenance log or record of repairs 1 of 13, a written procedure, scheme or certification 1 of 13 (13 rules, read 8 November 2026).",
  "Whose duty it is, by rule: the employer 7 of 13, the owner, user or operator of the equipment or process 4 of 13, the competent person who examines it 1 of 13, not stated 1 of 13 (13 rules, read 8 November 2026).",
  "How long the record is kept, by rule: no period set in the text 8 of 13, until the next inspection, or for the life of the equipment 3 of 13, a fixed period stated in the text 2 of 13 (13 rules, read 8 November 2026).",
  "The rule, in its own words, by rule: stated 13 of 13 (13 rules, read 8 November 2026)."
 ],
 "citation": "\"What the law makes a plant record about its equipment\", updated 2026-11-08, https://sellmaintenancedatatoai.com/datasets/maintenance-records-law/.",
 "national": {
  "n": 13,
  "unit": "rules",
  "documents": 13,
  "published_sources": 13,
  "named_sources": 16
 },
 "board": {
  "type": "clauses",
  "noun": {
   "one": "rule",
   "many": "rules"
  },
  "document": {
   "one": "text",
   "many": "texts"
  },
  "fields": [
   {
    "id": "what_is_recorded",
    "label": "What must be recorded",
    "counts": {
     "inspection-result": 9,
     "written-procedure": 1,
     "leak-repair": 2,
     "maintenance-log": 1
    },
    "values": [
     {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test"
     },
     {
      "value": "maintenance-log",
      "text": "a maintenance log or record of repairs"
     },
     {
      "value": "written-procedure",
      "text": "a written procedure, scheme or certification"
     },
     {
      "value": "leak-repair",
      "text": "refrigerant or gas leak checks and repairs"
     }
    ]
   },
   {
    "id": "duty_on",
    "label": "Whose duty it is",
    "counts": {
     "employer": 7,
     "not-stated": 1,
     "owner-operator": 4,
     "competent-person": 1
    },
    "values": [
     {
      "value": "employer",
      "text": "the employer"
     },
     {
      "value": "owner-operator",
      "text": "the owner, user or operator of the equipment or process"
     },
     {
      "value": "competent-person",
      "text": "the competent person who examines it"
     }
    ]
   },
   {
    "id": "how_long",
    "label": "How long the record is kept",
    "counts": {
     "not-set": 8,
     "fixed-period": 2,
     "until-next-or-life": 3
    },
    "values": [
     {
      "value": "fixed-period",
      "text": "a fixed period stated in the text"
     },
     {
      "value": "until-next-or-life",
      "text": "until the next inspection, or for the life of the equipment"
     },
     {
      "value": "not-set",
      "text": "no period set in the text"
     }
    ]
   },
   {
    "id": "rule_text",
    "label": "The rule, in its own words",
    "counts": {
     "stated": 13
    },
    "values": [
     {
      "value": "stated",
      "text": "stated"
     }
    ],
    "clause": true
   }
  ],
  "lead": {
   "type": "share",
   "field": "how_long",
   "value": "fixed-period",
   "n": 2,
   "of": 13,
   "label": "Rules that set a fixed period"
  },
  "vendors": [
   {
    "name": "29 CFR 1910.119(j), process safety mechanical integrity (OSHA)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.119",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
        "value": "inspection-result",
        "quote": "The employer shall document each inspection and test that has been performed on process equipment."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.119",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
        "value": "employer",
        "quote": "The employer shall document each inspection and test that has been performed on process equipment."
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.119",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
        "value": "not-set",
        "quote": "The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed"
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "The employer shall document each inspection and test that has been performed on process…",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.119",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
        "value": "stated",
        "quote": "The employer shall document each inspection and test that has been performed on process equipment."
       }
      ]
     }
    }
   },
   {
    "name": "29 CFR 1910.147, lockout and tagout (OSHA)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.147",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
        "value": "inspection-result",
        "quote": "The employer shall certify that the periodic inspections have been performed."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.147",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
        "value": "employer",
        "quote": "The employer shall certify that the periodic inspections have been performed."
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.147",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
        "value": "not-set",
        "quote": "The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "The certification shall identify the machine or equipment on which the energy control…",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.147",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
        "value": "stated",
        "quote": "The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection."
       }
      ]
     }
    }
   },
   {
    "name": "29 CFR 1910.178, powered industrial trucks (OSHA)",
    "answers": {
     "what_is_recorded": {
      "value": "written-procedure",
      "text": "a written procedure, scheme or certification",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.178",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
        "value": "written-procedure",
        "quote": "The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l)."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.178",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
        "value": "employer",
        "quote": "The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l)."
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.178",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
        "value": "not-set",
        "quote": "The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "If at any time a powered industrial truck is found to be in need of repair, defective, or…",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.178",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
        "value": "stated",
        "quote": "If at any time a powered industrial truck is found to be in need of repair, defective, or in any way unsafe, the truck shall be taken out of service until it has been restored to safe operating condition."
       }
      ]
     }
    }
   },
   {
    "name": "29 CFR 1910.179, overhead and gantry cranes (OSHA)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.179",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
        "value": "inspection-result",
        "quote": "A thorough inspection of all ropes shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected shall be kept on file where readily available to appointed personnel."
       }
      ]
     },
     "duty_on": {
      "value": "not-stated",
      "text": "not stated",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.179",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
        "value": "not-stated",
        "quote": ""
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.179",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
        "value": "not-set",
        "quote": "A thorough inspection of all ropes shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected shall be kept on file where readily available to appointed personnel."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "Visual inspection daily; monthly inspection with a certification record which includes…",
      "documents": [
       {
        "document": "eCFR 29 CFR 1910.179",
        "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
        "value": "stated",
        "quote": "Visual inspection daily; monthly inspection with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected."
       }
      ]
     }
    }
   },
   {
    "name": "40 CFR 68.73, risk management mechanical integrity (EPA)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "eCFR 40 CFR 68.73",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
        "value": "inspection-result",
        "quote": "The owner or operator shall document each inspection and test that has been performed on process equipment."
       }
      ]
     },
     "duty_on": {
      "value": "owner-operator",
      "text": "the owner, user or operator of the equipment or process",
      "documents": [
       {
        "document": "eCFR 40 CFR 68.73",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
        "value": "owner-operator",
        "quote": "The owner or operator shall document each inspection and test that has been performed on process equipment."
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "eCFR 40 CFR 68.73",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
        "value": "not-set",
        "quote": "The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed"
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "The owner or operator shall establish and implement written procedures to maintain the…",
      "documents": [
       {
        "document": "eCFR 40 CFR 68.73",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
        "value": "stated",
        "quote": "The owner or operator shall establish and implement written procedures to maintain the on-going integrity of process equipment."
       }
      ]
     }
    }
   },
   {
    "name": "40 CFR 82.157, appliance maintenance and leak repair (EPA)",
    "answers": {
     "what_is_recorded": {
      "value": "leak-repair",
      "text": "refrigerant or gas leak checks and repairs",
      "documents": [
       {
        "document": "eCFR 40 CFR 82.157",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
        "value": "leak-repair",
        "quote": "Owners or operators must maintain records of the dates and results of all initial and follow-up verification tests."
       }
      ]
     },
     "duty_on": {
      "value": "owner-operator",
      "text": "the owner, user or operator of the equipment or process",
      "documents": [
       {
        "document": "eCFR 40 CFR 82.157",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
        "value": "owner-operator",
        "quote": "Owners or operators must maintain a record including the following information for each time an appliance with a full charge of 50 or more pounds is maintained, serviced, repaired, or disposed of, when applicable."
       }
      ]
     },
     "how_long": {
      "value": "fixed-period",
      "text": "a fixed period stated in the text",
      "documents": [
       {
        "document": "eCFR 40 CFR 82.157",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
        "value": "fixed-period",
        "quote": "All records identified in this paragraph must be kept for at least three years in electronic or paper format, unless otherwise specified."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "Owners or operators must maintain a record including the following information for each…",
      "documents": [
       {
        "document": "eCFR 40 CFR 82.157",
        "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
        "value": "stated",
        "quote": "Owners or operators must maintain a record including the following information for each time an appliance with a full charge of 50 or more pounds is maintained, serviced, repaired, or disposed of, when applicable."
       }
      ]
     }
    }
   },
   {
    "name": "LOLER 1998 regulation 11, keeping of information (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
        "value": "inspection-result",
        "quote": "every report made to him under regulation 10(1)(b) is kept available for inspection"
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
        "value": "employer",
        "quote": "The employer shall ensure that the information contained in"
       }
      ]
     },
     "how_long": {
      "value": "until-next-or-life",
      "text": "until the next inspection, or for the life of the equipment",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
        "value": "until-next-or-life",
        "quote": "in the case of a thorough examination under paragraph (1) of regulation 9 of lifting equipment other than an accessory for lifting, until he ceases to use the lifting equipment;"
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "in the case of a thorough examination under paragraph (1) of regulation 9 of an accessory…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
        "value": "stated",
        "quote": "in the case of a thorough examination under paragraph (1) of regulation 9 of an accessory for lifting, for two years after the report is made;"
       }
      ]
     }
    }
   },
   {
    "name": "LOLER 1998 regulation 9, thorough examination and inspection (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
        "value": "inspection-result",
        "quote": "unless it is accompanied by physical evidence that the last thorough examination required to be carried out under this regulation has been carried out."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
        "value": "employer",
        "quote": "Every employer shall ensure that before lifting equipment is put into service for the first time by him it is thoroughly examined for any defect unless either"
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
        "value": "not-set",
        "quote": "unless it is accompanied by physical evidence that the last thorough examination required to be carried out under this regulation has been carried out."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "if appropriate for the purpose, is inspected by a competent person at suitable intervals…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
        "value": "stated",
        "quote": "if appropriate for the purpose, is inspected by a competent person at suitable intervals between thorough examinations,"
       }
      ]
     }
    }
   },
   {
    "name": "PSSR 2000 regulation 14, keeping of records (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 14",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
        "value": "inspection-result",
        "quote": "the last report relating to the system made by the competent person pursuant to regulation 9(3);"
       }
      ]
     },
     "duty_on": {
      "value": "owner-operator",
      "text": "the owner, user or operator of the equipment or process",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 14",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
        "value": "owner-operator",
        "quote": "The user of an installed system and the owner of a mobile system shall keep"
       }
      ]
     },
     "how_long": {
      "value": "until-next-or-life",
      "text": "until the next inspection, or for the life of the equipment",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 14",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
        "value": "until-next-or-life",
        "quote": "until a further examination has been carried out since that agreement or notification under the scheme of examination."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "Where the user or owner of a pressure system or part thereof changes, the previous user…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 14",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
        "value": "stated",
        "quote": "Where the user or owner of a pressure system or part thereof changes, the previous user or owner shall as soon as is practicable give to the new user or owner in writing anything (relating to the system or part thereof, as the case may be) kept by him under this regulation."
       }
      ]
     }
    }
   },
   {
    "name": "PSSR 2000 regulation 9, examination under the written scheme (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
        "value": "inspection-result",
        "quote": "state which parts of the pressure system have been examined, the condition of those parts and the results of the examination;"
       }
      ]
     },
     "duty_on": {
      "value": "competent-person",
      "text": "the competent person who examines it",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
        "value": "competent-person",
        "quote": "make a written report of the examination, sign it or add his name to it, date it and send it to the user (in the case of an installed system) or owner (in the case of a mobile system)"
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
        "value": "not-set",
        "quote": "make a written report of the examination, sign it or add his name to it, date it and send it to the user (in the case of an installed system) or owner (in the case of a mobile system)"
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "within 28 days of the completion of the examination (or, in the case of integrated…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 2000/128 regulation 9",
        "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
        "value": "stated",
        "quote": "within 28 days of the completion of the examination (or, in the case of integrated installed systems where the examination is part of a series, within 28 days of the completion of the last examination in that series); or"
       }
      ]
     }
    }
   },
   {
    "name": "PUWER 1998 regulation 5, maintenance (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "maintenance-log",
      "text": "a maintenance log or record of repairs",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
        "value": "maintenance-log",
        "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
        "value": "employer",
        "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date."
       }
      ]
     },
     "how_long": {
      "value": "not-set",
      "text": "no period set in the text",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
        "value": "not-set",
        "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "Every employer shall ensure that work equipment is maintained in an efficient state, in…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
        "value": "stated",
        "quote": "Every employer shall ensure that work equipment is maintained in an efficient state, in efficient working order and in good repair."
       }
      ]
     }
    }
   },
   {
    "name": "PUWER 1998 regulation 6, inspection (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "inspection-result",
      "text": "the result of an inspection, examination or test",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
        "value": "inspection-result",
        "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded."
       }
      ]
     },
     "duty_on": {
      "value": "employer",
      "text": "the employer",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
        "value": "employer",
        "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded."
       }
      ]
     },
     "how_long": {
      "value": "until-next-or-life",
      "text": "until the next inspection, or for the life of the equipment",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
        "value": "until-next-or-life",
        "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded."
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "Every employer shall ensure that the result of an inspection made under this regulation…",
      "documents": [
       {
        "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
        "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
        "value": "stated",
        "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded."
       }
      ]
     }
    }
   },
   {
    "name": "Retained F-gas Regulation (EU) 517/2014, article 6 (GB)",
    "answers": {
     "what_is_recorded": {
      "value": "leak-repair",
      "text": "refrigerant or gas leak checks and repairs",
      "documents": [
       {
        "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
        "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
        "value": "leak-repair",
        "quote": "Operators of equipment which is required to be checked for leaks pursuant to Article 4(1), shall establish and maintain records for each piece of such equipment specifying the following information:"
       }
      ]
     },
     "duty_on": {
      "value": "owner-operator",
      "text": "the owner, user or operator of the equipment or process",
      "documents": [
       {
        "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
        "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
        "value": "owner-operator",
        "quote": "Operators of equipment which is required to be checked for leaks pursuant to Article 4(1), shall establish and maintain records for each piece of such equipment specifying the following information:"
       }
      ]
     },
     "how_long": {
      "value": "fixed-period",
      "text": "a fixed period stated in the text",
      "documents": [
       {
        "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
        "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
        "value": "fixed-period",
        "quote": "the operators referred to in paragraph 1 shall keep the records referred to in that paragraph for at least five years;"
       }
      ]
     },
     "rule_text": {
      "value": "stated",
      "text": "the operators referred to in paragraph 1 shall keep the records referred to in that…",
      "documents": [
       {
        "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
        "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
        "value": "stated",
        "quote": "the operators referred to in paragraph 1 shall keep the records referred to in that paragraph for at least five years;"
       }
      ]
     }
    }
   }
  ]
 },
 "subject_kind": "rule",
 "rows": [
  {
   "subject": "29 CFR 1910.119(j), process safety mechanical integrity (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
   "document": "eCFR 29 CFR 1910.119",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-06",
   "quote": "The employer shall document each inspection and test that has been performed on process equipment.",
   "text_sha256": "eb2ff5e3c39e8f3b9c594401e20b1aa887a667a9721657cfa94e16aa15bce9b4"
  },
  {
   "subject": "29 CFR 1910.119(j), process safety mechanical integrity (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
   "document": "eCFR 29 CFR 1910.119",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-11-06",
   "quote": "The employer shall document each inspection and test that has been performed on process equipment.",
   "text_sha256": "eb2ff5e3c39e8f3b9c594401e20b1aa887a667a9721657cfa94e16aa15bce9b4"
  },
  {
   "subject": "29 CFR 1910.119(j), process safety mechanical integrity (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
   "document": "eCFR 29 CFR 1910.119",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-06",
   "quote": "The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed",
   "text_sha256": "eb2ff5e3c39e8f3b9c594401e20b1aa887a667a9721657cfa94e16aa15bce9b4"
  },
  {
   "subject": "29 CFR 1910.119(j), process safety mechanical integrity (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
   "document": "eCFR 29 CFR 1910.119",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "The employer shall document each inspection and test that has been performed on process…",
   "status": "stated",
   "retrieved_at": "2026-11-06",
   "quote": "The employer shall document each inspection and test that has been performed on process equipment.",
   "text_sha256": "eb2ff5e3c39e8f3b9c594401e20b1aa887a667a9721657cfa94e16aa15bce9b4"
  },
  {
   "subject": "29 CFR 1910.147, lockout and tagout (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
   "document": "eCFR 29 CFR 1910.147",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "The employer shall certify that the periodic inspections have been performed.",
   "text_sha256": "c884f84eecfca8232d03f2f16e6db3031234363b6ee77219149d512c828eafdc"
  },
  {
   "subject": "29 CFR 1910.147, lockout and tagout (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
   "document": "eCFR 29 CFR 1910.147",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "The employer shall certify that the periodic inspections have been performed.",
   "text_sha256": "c884f84eecfca8232d03f2f16e6db3031234363b6ee77219149d512c828eafdc"
  },
  {
   "subject": "29 CFR 1910.147, lockout and tagout (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
   "document": "eCFR 29 CFR 1910.147",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.",
   "text_sha256": "c884f84eecfca8232d03f2f16e6db3031234363b6ee77219149d512c828eafdc"
  },
  {
   "subject": "29 CFR 1910.147, lockout and tagout (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
   "document": "eCFR 29 CFR 1910.147",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "The certification shall identify the machine or equipment on which the energy control…",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.",
   "text_sha256": "c884f84eecfca8232d03f2f16e6db3031234363b6ee77219149d512c828eafdc"
  },
  {
   "subject": "29 CFR 1910.178, powered industrial trucks (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "document": "eCFR 29 CFR 1910.178",
   "question": "what_is_recorded",
   "answer": "written-procedure",
   "answer_text": "a written procedure, scheme or certification",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l).",
   "text_sha256": "3b2d789e844413879e6255fbb609af3f2f4ca67193f9db0af8b7f0dc6273abee"
  },
  {
   "subject": "29 CFR 1910.178, powered industrial trucks (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "document": "eCFR 29 CFR 1910.178",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l).",
   "text_sha256": "3b2d789e844413879e6255fbb609af3f2f4ca67193f9db0af8b7f0dc6273abee"
  },
  {
   "subject": "29 CFR 1910.178, powered industrial trucks (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "document": "eCFR 29 CFR 1910.178",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation.",
   "text_sha256": "3b2d789e844413879e6255fbb609af3f2f4ca67193f9db0af8b7f0dc6273abee"
  },
  {
   "subject": "29 CFR 1910.178, powered industrial trucks (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "document": "eCFR 29 CFR 1910.178",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "If at any time a powered industrial truck is found to be in need of repair, defective, or…",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "If at any time a powered industrial truck is found to be in need of repair, defective, or in any way unsafe, the truck shall be taken out of service until it has been restored to safe operating condition.",
   "text_sha256": "3b2d789e844413879e6255fbb609af3f2f4ca67193f9db0af8b7f0dc6273abee"
  },
  {
   "subject": "29 CFR 1910.179, overhead and gantry cranes (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "document": "eCFR 29 CFR 1910.179",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "A thorough inspection of all ropes shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected shall be kept on file where readily available to appointed personnel.",
   "text_sha256": "408b1fc4ea651acaf571dc3288ed5039625a1026837962eabe3c5faeaa1440dc"
  },
  {
   "subject": "29 CFR 1910.179, overhead and gantry cranes (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "document": "eCFR 29 CFR 1910.179",
   "question": "duty_on",
   "answer": "not-stated",
   "answer_text": "not stated",
   "status": "not-stated",
   "retrieved_at": "2026-11-02",
   "quote": "Nothing on this text answers it (41,804 characters of text text, read 2026-11-02).",
   "text_sha256": "408b1fc4ea651acaf571dc3288ed5039625a1026837962eabe3c5faeaa1440dc"
  },
  {
   "subject": "29 CFR 1910.179, overhead and gantry cranes (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "document": "eCFR 29 CFR 1910.179",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "A thorough inspection of all ropes shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected shall be kept on file where readily available to appointed personnel.",
   "text_sha256": "408b1fc4ea651acaf571dc3288ed5039625a1026837962eabe3c5faeaa1440dc"
  },
  {
   "subject": "29 CFR 1910.179, overhead and gantry cranes (OSHA)",
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "document": "eCFR 29 CFR 1910.179",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "Visual inspection daily; monthly inspection with a certification record which includes…",
   "status": "stated",
   "retrieved_at": "2026-11-02",
   "quote": "Visual inspection daily; monthly inspection with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected.",
   "text_sha256": "408b1fc4ea651acaf571dc3288ed5039625a1026837962eabe3c5faeaa1440dc"
  },
  {
   "subject": "40 CFR 68.73, risk management mechanical integrity (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
   "document": "eCFR 40 CFR 68.73",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "The owner or operator shall document each inspection and test that has been performed on process equipment.",
   "text_sha256": "24263f38c57611db1b2b1aec5d41b6e60e045f95925c00f0430a416ae4fc0beb"
  },
  {
   "subject": "40 CFR 68.73, risk management mechanical integrity (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
   "document": "eCFR 40 CFR 68.73",
   "question": "duty_on",
   "answer": "owner-operator",
   "answer_text": "the owner, user or operator of the equipment or process",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "The owner or operator shall document each inspection and test that has been performed on process equipment.",
   "text_sha256": "24263f38c57611db1b2b1aec5d41b6e60e045f95925c00f0430a416ae4fc0beb"
  },
  {
   "subject": "40 CFR 68.73, risk management mechanical integrity (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
   "document": "eCFR 40 CFR 68.73",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed",
   "text_sha256": "24263f38c57611db1b2b1aec5d41b6e60e045f95925c00f0430a416ae4fc0beb"
  },
  {
   "subject": "40 CFR 68.73, risk management mechanical integrity (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
   "document": "eCFR 40 CFR 68.73",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "The owner or operator shall establish and implement written procedures to maintain the…",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "The owner or operator shall establish and implement written procedures to maintain the on-going integrity of process equipment.",
   "text_sha256": "24263f38c57611db1b2b1aec5d41b6e60e045f95925c00f0430a416ae4fc0beb"
  },
  {
   "subject": "40 CFR 82.157, appliance maintenance and leak repair (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "document": "eCFR 40 CFR 82.157",
   "question": "what_is_recorded",
   "answer": "leak-repair",
   "answer_text": "refrigerant or gas leak checks and repairs",
   "status": "stated",
   "retrieved_at": "2026-10-26",
   "quote": "Owners or operators must maintain records of the dates and results of all initial and follow-up verification tests.",
   "text_sha256": "c16ff0e2d134c6c98034534a4e81000f8364375c1ac434c5aa5fca3c75f70339"
  },
  {
   "subject": "40 CFR 82.157, appliance maintenance and leak repair (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "document": "eCFR 40 CFR 82.157",
   "question": "duty_on",
   "answer": "owner-operator",
   "answer_text": "the owner, user or operator of the equipment or process",
   "status": "stated",
   "retrieved_at": "2026-10-26",
   "quote": "Owners or operators must maintain a record including the following information for each time an appliance with a full charge of 50 or more pounds is maintained, serviced, repaired, or disposed of, when applicable.",
   "text_sha256": "c16ff0e2d134c6c98034534a4e81000f8364375c1ac434c5aa5fca3c75f70339"
  },
  {
   "subject": "40 CFR 82.157, appliance maintenance and leak repair (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "document": "eCFR 40 CFR 82.157",
   "question": "how_long",
   "answer": "fixed-period",
   "answer_text": "a fixed period stated in the text",
   "status": "stated",
   "retrieved_at": "2026-10-26",
   "quote": "All records identified in this paragraph must be kept for at least three years in electronic or paper format, unless otherwise specified.",
   "text_sha256": "c16ff0e2d134c6c98034534a4e81000f8364375c1ac434c5aa5fca3c75f70339"
  },
  {
   "subject": "40 CFR 82.157, appliance maintenance and leak repair (EPA)",
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "document": "eCFR 40 CFR 82.157",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "Owners or operators must maintain a record including the following information for each…",
   "status": "stated",
   "retrieved_at": "2026-10-26",
   "quote": "Owners or operators must maintain a record including the following information for each time an appliance with a full charge of 50 or more pounds is maintained, serviced, repaired, or disposed of, when applicable.",
   "text_sha256": "c16ff0e2d134c6c98034534a4e81000f8364375c1ac434c5aa5fca3c75f70339"
  },
  {
   "subject": "LOLER 1998 regulation 11, keeping of information (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "every report made to him under regulation 10(1)(b) is kept available for inspection",
   "text_sha256": "dabe5a1b06ce66c6256d62d3a151942f5f7fd8bbcdc73e1847ffcd6bde72d6c9"
  },
  {
   "subject": "LOLER 1998 regulation 11, keeping of information (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "The employer shall ensure that the information contained in",
   "text_sha256": "dabe5a1b06ce66c6256d62d3a151942f5f7fd8bbcdc73e1847ffcd6bde72d6c9"
  },
  {
   "subject": "LOLER 1998 regulation 11, keeping of information (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
   "question": "how_long",
   "answer": "until-next-or-life",
   "answer_text": "until the next inspection, or for the life of the equipment",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "in the case of a thorough examination under paragraph (1) of regulation 9 of lifting equipment other than an accessory for lifting, until he ceases to use the lifting equipment;",
   "text_sha256": "dabe5a1b06ce66c6256d62d3a151942f5f7fd8bbcdc73e1847ffcd6bde72d6c9"
  },
  {
   "subject": "LOLER 1998 regulation 11, keeping of information (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 11",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "in the case of a thorough examination under paragraph (1) of regulation 9 of an accessory…",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "in the case of a thorough examination under paragraph (1) of regulation 9 of an accessory for lifting, for two years after the report is made;",
   "text_sha256": "dabe5a1b06ce66c6256d62d3a151942f5f7fd8bbcdc73e1847ffcd6bde72d6c9"
  },
  {
   "subject": "LOLER 1998 regulation 9, thorough examination and inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "unless it is accompanied by physical evidence that the last thorough examination required to be carried out under this regulation has been carried out.",
   "text_sha256": "dbb35de597dfc46f77cf8f0e3066a9dde8c2ee6118093c1ce2a337434d890f18"
  },
  {
   "subject": "LOLER 1998 regulation 9, thorough examination and inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "Every employer shall ensure that before lifting equipment is put into service for the first time by him it is thoroughly examined for any defect unless either",
   "text_sha256": "dbb35de597dfc46f77cf8f0e3066a9dde8c2ee6118093c1ce2a337434d890f18"
  },
  {
   "subject": "LOLER 1998 regulation 9, thorough examination and inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "unless it is accompanied by physical evidence that the last thorough examination required to be carried out under this regulation has been carried out.",
   "text_sha256": "dbb35de597dfc46f77cf8f0e3066a9dde8c2ee6118093c1ce2a337434d890f18"
  },
  {
   "subject": "LOLER 1998 regulation 9, thorough examination and inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
   "document": "legislation.gov.uk, SI 1998/2307 regulation 9",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "if appropriate for the purpose, is inspected by a competent person at suitable intervals…",
   "status": "stated",
   "retrieved_at": "2026-11-07",
   "quote": "if appropriate for the purpose, is inspected by a competent person at suitable intervals between thorough examinations,",
   "text_sha256": "dbb35de597dfc46f77cf8f0e3066a9dde8c2ee6118093c1ce2a337434d890f18"
  },
  {
   "subject": "PSSR 2000 regulation 14, keeping of records (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
   "document": "legislation.gov.uk, SI 2000/128 regulation 14",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "the last report relating to the system made by the competent person pursuant to regulation 9(3);",
   "text_sha256": "d1dcc3781ae5872e339e52730d9b0924feb86550e5fb063e6da8abff91686784"
  },
  {
   "subject": "PSSR 2000 regulation 14, keeping of records (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
   "document": "legislation.gov.uk, SI 2000/128 regulation 14",
   "question": "duty_on",
   "answer": "owner-operator",
   "answer_text": "the owner, user or operator of the equipment or process",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "The user of an installed system and the owner of a mobile system shall keep",
   "text_sha256": "d1dcc3781ae5872e339e52730d9b0924feb86550e5fb063e6da8abff91686784"
  },
  {
   "subject": "PSSR 2000 regulation 14, keeping of records (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
   "document": "legislation.gov.uk, SI 2000/128 regulation 14",
   "question": "how_long",
   "answer": "until-next-or-life",
   "answer_text": "until the next inspection, or for the life of the equipment",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "until a further examination has been carried out since that agreement or notification under the scheme of examination.",
   "text_sha256": "d1dcc3781ae5872e339e52730d9b0924feb86550e5fb063e6da8abff91686784"
  },
  {
   "subject": "PSSR 2000 regulation 14, keeping of records (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
   "document": "legislation.gov.uk, SI 2000/128 regulation 14",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "Where the user or owner of a pressure system or part thereof changes, the previous user…",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "Where the user or owner of a pressure system or part thereof changes, the previous user or owner shall as soon as is practicable give to the new user or owner in writing anything (relating to the system or part thereof, as the case may be) kept by him under this regulation.",
   "text_sha256": "d1dcc3781ae5872e339e52730d9b0924feb86550e5fb063e6da8abff91686784"
  },
  {
   "subject": "PSSR 2000 regulation 9, examination under the written scheme (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
   "document": "legislation.gov.uk, SI 2000/128 regulation 9",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "state which parts of the pressure system have been examined, the condition of those parts and the results of the examination;",
   "text_sha256": "73f94f3b205e3da1e62f9ae0c5cfcecdcfa50e7d797142795edd0a1609d40d0e"
  },
  {
   "subject": "PSSR 2000 regulation 9, examination under the written scheme (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
   "document": "legislation.gov.uk, SI 2000/128 regulation 9",
   "question": "duty_on",
   "answer": "competent-person",
   "answer_text": "the competent person who examines it",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "make a written report of the examination, sign it or add his name to it, date it and send it to the user (in the case of an installed system) or owner (in the case of a mobile system)",
   "text_sha256": "73f94f3b205e3da1e62f9ae0c5cfcecdcfa50e7d797142795edd0a1609d40d0e"
  },
  {
   "subject": "PSSR 2000 regulation 9, examination under the written scheme (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
   "document": "legislation.gov.uk, SI 2000/128 regulation 9",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "make a written report of the examination, sign it or add his name to it, date it and send it to the user (in the case of an installed system) or owner (in the case of a mobile system)",
   "text_sha256": "73f94f3b205e3da1e62f9ae0c5cfcecdcfa50e7d797142795edd0a1609d40d0e"
  },
  {
   "subject": "PSSR 2000 regulation 9, examination under the written scheme (GB)",
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
   "document": "legislation.gov.uk, SI 2000/128 regulation 9",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "within 28 days of the completion of the examination (or, in the case of integrated…",
   "status": "stated",
   "retrieved_at": "2026-11-01",
   "quote": "within 28 days of the completion of the examination (or, in the case of integrated installed systems where the examination is part of a series, within 28 days of the completion of the last examination in that series); or",
   "text_sha256": "73f94f3b205e3da1e62f9ae0c5cfcecdcfa50e7d797142795edd0a1609d40d0e"
  },
  {
   "subject": "PUWER 1998 regulation 5, maintenance (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
   "question": "what_is_recorded",
   "answer": "maintenance-log",
   "answer_text": "a maintenance log or record of repairs",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date.",
   "text_sha256": "c9d1c1bbd4413e61c01b53a7e6d4540b4ffa00634cbc60bc6eea007f48ddf7cb"
  },
  {
   "subject": "PUWER 1998 regulation 5, maintenance (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date.",
   "text_sha256": "c9d1c1bbd4413e61c01b53a7e6d4540b4ffa00634cbc60bc6eea007f48ddf7cb"
  },
  {
   "subject": "PUWER 1998 regulation 5, maintenance (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
   "question": "how_long",
   "answer": "not-set",
   "answer_text": "no period set in the text",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "Every employer shall ensure that where any machinery has a maintenance log, the log is kept up to date.",
   "text_sha256": "c9d1c1bbd4413e61c01b53a7e6d4540b4ffa00634cbc60bc6eea007f48ddf7cb"
  },
  {
   "subject": "PUWER 1998 regulation 5, maintenance (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 5",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "Every employer shall ensure that work equipment is maintained in an efficient state, in…",
   "status": "stated",
   "retrieved_at": "2026-10-31",
   "quote": "Every employer shall ensure that work equipment is maintained in an efficient state, in efficient working order and in good repair.",
   "text_sha256": "c9d1c1bbd4413e61c01b53a7e6d4540b4ffa00634cbc60bc6eea007f48ddf7cb"
  },
  {
   "subject": "PUWER 1998 regulation 6, inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
   "question": "what_is_recorded",
   "answer": "inspection-result",
   "answer_text": "the result of an inspection, examination or test",
   "status": "stated",
   "retrieved_at": "2026-11-08",
   "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded.",
   "text_sha256": "b99682e685375efb5e805e62398d91cce823234db714595a4bf3c370e0e896f7"
  },
  {
   "subject": "PUWER 1998 regulation 6, inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
   "question": "duty_on",
   "answer": "employer",
   "answer_text": "the employer",
   "status": "stated",
   "retrieved_at": "2026-11-08",
   "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded.",
   "text_sha256": "b99682e685375efb5e805e62398d91cce823234db714595a4bf3c370e0e896f7"
  },
  {
   "subject": "PUWER 1998 regulation 6, inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
   "question": "how_long",
   "answer": "until-next-or-life",
   "answer_text": "until the next inspection, or for the life of the equipment",
   "status": "stated",
   "retrieved_at": "2026-11-08",
   "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded.",
   "text_sha256": "b99682e685375efb5e805e62398d91cce823234db714595a4bf3c370e0e896f7"
  },
  {
   "subject": "PUWER 1998 regulation 6, inspection (GB)",
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "document": "legislation.gov.uk, SI 1998/2306 regulation 6",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "Every employer shall ensure that the result of an inspection made under this regulation…",
   "status": "stated",
   "retrieved_at": "2026-11-08",
   "quote": "Every employer shall ensure that the result of an inspection made under this regulation is recorded and kept until the next inspection under this regulation is recorded.",
   "text_sha256": "b99682e685375efb5e805e62398d91cce823234db714595a4bf3c370e0e896f7"
  },
  {
   "subject": "Retained F-gas Regulation (EU) 517/2014, article 6 (GB)",
   "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
   "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
   "question": "what_is_recorded",
   "answer": "leak-repair",
   "answer_text": "refrigerant or gas leak checks and repairs",
   "status": "stated",
   "retrieved_at": "2026-10-28",
   "quote": "Operators of equipment which is required to be checked for leaks pursuant to Article 4(1), shall establish and maintain records for each piece of such equipment specifying the following information:",
   "text_sha256": "97265b77e2034977c7028905577f08c8bbd12648762fdf0ab6c5cfc04d8068bb"
  },
  {
   "subject": "Retained F-gas Regulation (EU) 517/2014, article 6 (GB)",
   "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
   "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
   "question": "duty_on",
   "answer": "owner-operator",
   "answer_text": "the owner, user or operator of the equipment or process",
   "status": "stated",
   "retrieved_at": "2026-10-28",
   "quote": "Operators of equipment which is required to be checked for leaks pursuant to Article 4(1), shall establish and maintain records for each piece of such equipment specifying the following information:",
   "text_sha256": "97265b77e2034977c7028905577f08c8bbd12648762fdf0ab6c5cfc04d8068bb"
  },
  {
   "subject": "Retained F-gas Regulation (EU) 517/2014, article 6 (GB)",
   "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
   "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
   "question": "how_long",
   "answer": "fixed-period",
   "answer_text": "a fixed period stated in the text",
   "status": "stated",
   "retrieved_at": "2026-10-28",
   "quote": "the operators referred to in paragraph 1 shall keep the records referred to in that paragraph for at least five years;",
   "text_sha256": "97265b77e2034977c7028905577f08c8bbd12648762fdf0ab6c5cfc04d8068bb"
  },
  {
   "subject": "Retained F-gas Regulation (EU) 517/2014, article 6 (GB)",
   "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
   "document": "legislation.gov.uk, Regulation (EU) 517/2014 article 6",
   "question": "rule_text",
   "answer": "stated",
   "answer_text": "the operators referred to in paragraph 1 shall keep the records referred to in that…",
   "status": "stated",
   "retrieved_at": "2026-10-28",
   "quote": "the operators referred to in paragraph 1 shall keep the records referred to in that paragraph for at least five years;",
   "text_sha256": "97265b77e2034977c7028905577f08c8bbd12648762fdf0ab6c5cfc04d8068bb"
  }
 ],
 "sources": [
  {
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F/section-82.157",
   "label": "eCFR :: 40 CFR 82.157 -- Appliance maintenance and leak repair.",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/eur/2014/517/article/6",
   "label": "Regulation (EU) No 517/2014 of the European Parliament and of the Council of 16 April 2014",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-J/section-1910.147",
   "label": "eCFR :: 29 CFR 1910.147 -- The control of hazardous energy (lockout/tagout).",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.179",
   "label": "eCFR :: 29 CFR 1910.179 -- Overhead and gantry cranes.",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-H/section-1910.119",
   "label": "eCFR :: 29 CFR 1910.119 -- Process safety management of highly hazardous chemicals.",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-N/section-1910.178",
   "label": "eCFR :: 29 CFR 1910.178 -- Powered industrial trucks.",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-68/subpart-D/section-68.73",
   "label": "eCFR :: 40 CFR 68.73 -- Mechanical integrity.",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/5",
   "label": "The Provision and Use of Work Equipment Regulations 1998",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1998/2306/regulation/6",
   "label": "The Provision and Use of Work Equipment Regulations 1998",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/11",
   "label": "The Lifting Operations and Lifting Equipment Regulations 1998",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1998/2307/regulation/9",
   "label": "The Lifting Operations and Lifting Equipment Regulations 1998",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/14",
   "label": "The Pressure Systems Safety Regulations 2000",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/1989/635/regulation/4",
   "label": "The Electricity at Work Regulations 1989",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "not-terms",
   "why": "EAWR 1989 regulation 4 requires electrical systems to be maintained but sets no record in its text"
  },
  {
   "url": "https://www.legislation.gov.uk/uksi/2000/128/regulation/9",
   "label": "The Pressure Systems Safety Regulations 2000",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "read"
  },
  {
   "url": "https://www.hse.gov.uk/work-equipment-machinery/puwer.htm",
   "label": "Provision and Use of Work Equipment Regulations 1998 (PUWER)",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "not-terms",
   "why": "HSE's PUWER page is an index of links to its guidance; it states no rule itself"
  },
  {
   "url": "https://www.hse.gov.uk/work-equipment-machinery/loler.htm",
   "label": "Lifting Operations and Lifting Equipment Regulations (LOLER)",
   "license": "cited for reporting; the publisher's own eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records",
   "class": "primary-government",
   "status": "not-terms",
   "why": "HSE's LOLER page is an index of links to its guidance; it states no rule itself"
  }
 ],
 "methodology": "We read each rule's eCFR, legislation.gov.uk and HSE texts on equipment maintenance and inspection records through our own reader and stored every text in full, with a sha256 hash on each row. Every text was read for four questions, each answer taken from its own words: what must be recorded, whose duty it is, how long the record is kept, the rule, in its own words. A stated answer always carries its sentence, checked against what was stored. Where it says 'not stated', the text does not address the question; 'varies' means a rule's texts give different answers. Read: 13 rules, 13 texts.",
 "embed": "<figure style=\"margin:0;padding:12px 16px;border-top:3px solid #be123c;border-bottom:1px solid #e5e7eb;background:#ffffff;color:#18181b;font-family:ui-serif,Georgia,serif;max-width:500px\"><blockquote style=\"margin:0 0 8px;font-size:14px;font-style:italic;color:#3f3f46;background:#ffffff\">2 of 13 equipment record rules read fix a period for keeping the record, newest read 8 November 2026.</blockquote><figcaption style=\"font-size:12px;color:#52525b;background:#ffffff\"><a href=\"https://sellmaintenancedatatoai.com/datasets/maintenance-records-law/\" style=\"color:#be123c;background:#ffffff\">Figures: What the law makes a plant record about its equipment, sellmaintenancedatatoai.com</a></figcaption></figure>"
}